![Teardrop Pallet Racking Teardrop Pallet Racking]()
Short Description:
Teardrop pallet racking system is used for storing
pallet packed products, by forklift operation. Main parts of the whole
pallet racking include upright frames and beams, along with a wide range
of accessories, like upright protector, aisle protector, pallet
support, pallet stopper, wire decking, etc.
Product Details
Racking Components:
![Teardrop Pallet Racking Teardrop Pallet Racking]()
![Teardrop Pallet Racking Teardrop Pallet Racking]()
![Teardrop Pallet Racking Teardrop Pallet Racking]()
It mainly consists of Beams and Upright Frame. Use with other accessories to achieve different functions.
Advantages
1. No Import Duty to U.S.A.,COO can be provided
2. No Anti-dumping & Anti-subsidy Margin for Rack
3. Lower Labor Cost
4. Thailand Production – Shorter Production Time
![Teardrop Pallet Racking Teardrop Pallet Racking]()
![Teardrop Pallet Racking Teardrop Pallet Racking]()
![Teardrop Pallet Racking Teardrop Pallet Racking]()
Name | Teardrop Pallet Rack | Material | Steel |
Gauge | 36'-42' | Weight Capacity | 11000-51000lbs |
Width | 36'-48' | Height | Customized |
Frame Structure Type | 3'*3';4'*4' |
Beam Type | 3'-6' Step Beam |
Surface finish | Powder coating &Galvanized |
Free Sample | Available (Delivery Cost on Buyer) |
OEM | Available |
![Teardrop Pallet Racking Teardrop Pallet Racking]()
1. Inform (Thailand) factory, located in Weihua Industrial Park, Chonburi, Thailand, covers an area of 34,816 square meters, with a planned total investment of 15 million US dollars;
2. It’s mainly used for the USA tear drop racking and automated equipment just like intelligent logistics robots, stacker cranes, AGV/RGV, high-precision racking and other products that meet overseas standards;
3. It is estimated that the production capacity of AGV/RGV, shuttle machine, etc. will reach 1000 sets per year, and the annual output of high-precision shelves will exceed 20000 tons.
Shipment
Item | Loading Port | Destination Port | Period |
1 | Laem Chabang | Long Beach Port | 20-35 days |
2 | Laem Chabang | Houston Port | 20-35 days |
3 | Laem Chabang | Miami Port | 20-35 days |
4 | Laem Chabang | New York Port | 20-35 days |
Why choose us?
![Teardrop Pallet Racking Teardrop Pallet Racking]()
Top 3 Racking Suppler In China
The Only One A-share Listed Racking Manufacturer
1. NanJing Inform Storage Equipment Group,as a public listed state controlled enterprise, specialized in the logistic storage solution field since 1997.( 26 years of experience)
2.Core Business: Racking
Strategic Business:Automatic System Integration
Growing Business: Warehouse Operation Service
3.Inform owns 6 factories, with over 1000 employees. Inform listed A-share on June 11, 2015, stock code: 603066, becoming the first listed company in China’s warehousing industry.
![Teardrop Pallet Racking Teardrop Pallet Racking]()
![Teardrop Pallet Racking Teardrop Pallet Racking]()
![Teardrop Pallet Racking Teardrop Pallet Racking]()
![Teardrop Pallet Racking Teardrop Pallet Racking]()
![Teardrop Pallet Racking Teardrop Pallet Racking]()
![Teardrop Pallet Racking Teardrop Pallet Racking]()
Q1: What’s your trading terms?
1) Payment terms: As general, T/T 30% deposit after order confirmed, 70% balance paid against BL. L/C also available.
2) Shipping port: Shanghai / Nanjing port China.
3) Discounts: we will offer the biggest discount for large quantity.
Q2: Are you a factory or trading company?
A:We are factory and have 5 factories.We’ve been in the market of logistic storage solutionssince 1997.We design,manufacture racking and assemble shuttle, four-way shuttle etc by ourselves.
Q3: Do you have OEM products to sell?
A:Yes.Both OEM and ODM are available .
Q4:Do you have the minimum order requirements?
A:Any quantity and customized design is acceptable.
Q5:Are samples available?
A:Yes. Short sections of samples can be provided for free, but the international transportation will be at the customers’ expense.
Q6:What’s the delivery time?
A:It depends on the order quantity and racking types. Generally speaking, for the standard pallet racking, it will be within 20 days.